About Mawaqaa
A leading app development company which is founded in 2002. They design and develop your applications using their expertise in mobile platforms development, following the global industry standards with their UX/UI creativity. Their team of highly skilled developers, designers, and testers who are committed to coming up with some amazingly designed apps.
Last updated May 13, 2026
Services
Industries Served
Mawaqaa Reviews
Write a ReviewConnected hardware platform that eliminated the blind spots in our operational data
Nisha Pillai / Director of Engineering - GrowthBridge VenturesJan 28, 2026
Project summary: Several years of incremental development had left us with a platform that was technically functional but strategically limiting. A structured rebuild was the agreed path forward.
Six months after go-live our platform is processing three times the transaction volume we specified in the original brief. The architecture choices made during discovery accommodated that growth without remediation work. That is the difference between a team that designs for what you tell them and a team that designs for what you are likely to need. We are in conversation about a Phase 2 engagement and I expect to be using this partnership for several years.
Production system that has performed as specified since go-live without remediation work, documentation thorough enough to support internal maintenance, knowledge transfer that left our team genuinely capable
Their insistence on a detailed functional specification before development began felt like friction at the time. In retrospect, it was the reason the development phase ran without the ambiguity that has derailed similar projects for us previously
Questions & Answers
A DevOps engagement that delivered cultural change as well as technical change
Nora Al-Otaibi / VP of Engineering - Salam Digital SolutionsJan 15, 2026
Project summary: Our mobile app had a 2.9-star average review score. The two themes in every negative review were speed and booking flow complexity — both were solvable with the right engineering partner.
The thing that retrospectively seems most significant is how little drama there was. Complex technology projects tend to accumulate incidents, escalations, and tense conversations. This one did not. Problems were surfaced before they became incidents. Scope changes were handled with process rather than conflict. Risks were managed rather than avoided. That level of maturity is rare in my experience and it made the delivery feel almost effortless from our side, which I know it was not from theirs.
Production system that has performed as specified since go-live without remediation work, documentation thorough enough to support internal maintenance, knowledge transfer that left our team genuinely capable
We underestimated the input required from our subject matter experts during the requirements phase. The team flagged this early but our resource planning did not fully reflect it — our responsibility, not theirs
Questions & Answers
The kind of web build that makes you wonder why you tolerated the old site for so long
Liselotte Bakker / Head of Platform Engineering - Harbour Digital BVJan 07, 2026
Project summary: Our engineering capacity was committed to maintaining existing systems and could not absorb a net-new build of this complexity. An external partner with the right skills was the only viable option.
We gave this team an aggressive timeline, a technically complex scope, and a client-side project team that was stretched thin and not always available at the speed the engagement required. They absorbed all of that gracefully. Where they needed input they were precise about what they needed and when. Where they could proceed independently they did. The result was a delivery that landed on time despite the constraints on our side, which I regard as evidence of genuine professional maturity.
Senior-level engineering presence throughout the entire project, not just during the pitch, honest and commercially fair handling of scope changes, codebase that our internal team praised on review
Time zone coordination required some deliberate overlap management from both sides in the first couple of sprints, after which we had an efficient async rhythm that worked for the whole project